Breaking News

Direct approach road from By-pass to Phase- 3 campus inaugurated

TechnoparkToday.com>>  The direct approach road from NH By-pass to Technopark Phase- 3 campus was inaugurated by Shri.Kadakampally Surendran, Hon’ble Minister for Devaswom, Tourism and Co-Operation on 27-03-2017 (Monday) at 10 a.m.

This approach road has a length of around 150 metres with an average width of 18.50 meters having storm water drains and ducts for utility services like water and power. This approach road has a bridge of length of around 12 metres which is designed to carry heavy loads. The total cost including bridge, road, ducts etc comes to around Rs 2.70 crores.

The new road will connect NH bypass and Technopark Phase III campus, Ganga and Yamuna buildings.

Technopark third phase would be the best entrance among all the Technopark buildings so far.

TechnoparkToday.com

       

Check Also

ATeam Soft Solutions announces period leave for women employees

As part of the updated Leave Policy, ATeam Soft Solutions Pvt Ltd, announces that they …